Saskatchewan tender

Buffalo Pound Erosion and Earthworks Repair

Reference number: 2026-27OE-0021

Issuing organization: Water Security Agency

Published: 2026-04-16

Closing date: 2026-05-08

Tender details

The Water Security Agency needs a contractor to stabilize Buffalo Pound Dam’s north embankment and reduce seepage risks. Work includes constructing a cofferdam and dewatering, installing a sheet pile cut-off wall, repairing erosion and animal burrowing, and placing rip rap on the upstream and downstream slopes, plus road signage and markers. This is a civil/heavy construction job aimed at improving dam safety, slope stability, and long-term flood/water infrastructure reliability.

View the official tender notice

Open the interactive tender details page